Damp Proofing Technician Training Course ( FODCT ) 10 Sections77 Lessons1 QuizLifetime
Curriculum
- 10 Sections
- 77 Lessons
- Lifetime
Expand all sectionsCollapse all sections
- Introduction1 Item
- MODULE 1 – DAMP DIAGNOSIS BASICS8 Items
- MODULE 2 – SITE PREPARATION9 Items
- MODULE 3 - DAMP PROOFING INSTALLATION SYSTEMS13 Items
- 4.13.1 Purpose of a Chemical Damp Proof Course
- 4.23.2 Limitations of Chemical DPC Systems
- 4.33.3 Types of Chemical DPC Systems
- 4.43.4 Locating the DPC Injection Line
- 4.53.5 Drilling Patterns
- 4.63.6 Drilling Technique
- 4.73.7 Injection Procedure
- 4.83.8 Internal vs External Installation
- 4.93.9 Plugging and Sealing Injection Holes
- 4.103.10 Avoiding Bridging
- 4.113.11 Curing and Drying
- 4.123.12 Technician Responsibilities
- 4.13Module 3: Summary
- MODULE 4 - RENDERING APPLICATIONS13 Items
- 5.14.1 Purpose of Waterproof Rendering
- 5.24.2 Role of Rendering After Damp Proofing
- 5.34.3 Components of Waterproof Render Systems
- 5.44.4 Render Mix Ratios
- 5.54.5 Preparation Prior to Rendering
- 5.64.6 Scratch Coat Application
- 5.74.7 Top Coat Application
- 5.84.8 Avoiding Bridging of the Damp Proof Course
- 5.94.9 Common Application Errors
- 5.104.10 Curing and Drying
- 5.114.11 Compatibility With Replastering Systems
- 5.124.12 Technician Responsibilities
- 5.13Module 4: Summary
- MODULE 5 – MEMBRANE & TANKING SYSTEMS12 Items
- 6.15.1 Purpose of Membrane & Tanking Systems
- 6.25.2 Understanding Moisture Pressure
- 6.35.3 Membrane Systems
- 6.45.4 Fixings and Detailing
- 6.55.5 Jointing and Sealing
- 6.65.6 Tanking Systems
- 6.75.7 Surface Preparation for Tanking
- 6.85.8 Tanking Application
- 6.95.9 Common Installation Errors
- 6.105.10 Integration With Other Systems
- 6.115.11 Technician Responsibilities
- 6.12Module 5: Summary
- MODULE 6 – REPLASTERING & FINISHING11 Items
- 7.16.1 Purpose of Correct Replastering
- 7.26.2 Salt Contamination and Its Effects
- 7.36.3 Salt-Resistant Plaster Systems
- 7.46.4 Preparation Prior to Replastering
- 7.56.5 Application of Replastering Systems
- 7.66.6 Drying and Curing
- 7.76.7 Ventilation Considerations
- 7.86.8 Finishing for Decoration
- 7.96.9 Common Replastering Errors
- 7.106.10 Technician Responsibilities
- 7.11Module 6: Summary
- MODULE 7 – QUALITY CONTROL & AFTERCARE8 Items
- EXAM2 Items
- COURSE CONCLUSION1 Item

